Episode #1.2 | 16 May 2016 | Episode Runtime: 0hr 10m 0s

episode list | subscribe

episode #1.2 | The Contract: PROJECT: Waterman [season 1]

PG Documentary, Drama, Miscellaneous 180 Minutes

PLOT OUTLINE: News of KANE’s fate shakes the entire team at STM Asia Pacific Construction to the very core.  WATERMAN’s worksite specific prereview nearly doesn’t happen – an early morning emergency media call sees him fronting a hungry media pack about KANE’s ‘workplace incident’. 

PLOT SUMMARY: Trains packed with peak hour commuters speed past a demonstration of works underway at the Blackburn Level Crossing Removal Project. Mere metres separate the trains from workers unloading and storing 15 metre lengths of iron wire tubes 

Unknown to investors on the tour, a dangerous work-place incident has occurred involving KANE – a valued member of STM Asia Pacific’s workforce. WATERMAN has already fronted a hungry media pack at the work-site in the early morning hours.

WATERMAN finds himself at the centre of a media storm giving an off-the-cuff, unauthorised, raw ‘door-stop’ media conference. News of KANE’s workplace incident shakes the entire team at STM Asia Pacific Construction to the very core.

As the day unfolds, WATERMAN navigates STM’s investor relations tour through 5 various locations within Melbourne’s CBD and inner suburbs.

Forget the idea’s economy – it’s garbage. Australia’s future lies within the public transport infrastructure sector. Join WATERMAN’S ‘public relations tour’ around Melbourne’s exploding construction activity for exclusive behind-the-scenes access to some of the biggest train network infrastructure project’s this country has ever seen.

Web Series | 2021 PG | Season 1 | 17 Episodes Runtime: 11 x 0hr10m, 6 x 0hr11m
documentary, mockumentary, docufiction

Global Partners – ott-vod-svod-aod Consulting, content licensing and distribution queries welcome.

Callumny Films – seller profile | content buyers

© Wise Words Media and Callumny Films 2010 – 2021 all footage and stills


TECH SPECS

Production Studios | Wise Words Media, Callumny Films

Type | TV Series

Countries of origin | Australia

Format | SD

Audio Languages | English

Dubbing Languages | Nil

FILMING LOCATIONS | Melbourne, Australia

  • Cottage St, Blackburn
  • Blackburn Train Station, Platform 1
  • Level Crossing, Blackburn Rd, Blackburn
  • Level Crossing, Union St, Windsor
  • Windsor Siding, Union St, Windsor
  • EastLink, Whitehorse Rd, Mahroondah Highway, Ringwood
  • Box Hill Central, Station St/ Rutland Rd, Box Hill

The Contract: PROJECT: Waterman [season 1]

Episode #1.2 | 16 May 2016 | Episode Runtime: 0hr 10m 0s

When the safety of local kids in WATERMAN’s community is put at risk by train & public transport sector works around a local football oval, the infrastructure consultant must choose between his job and his own moral code.

get the inside view from the industry outsider
Australia’s future – now more than ever – needs public transport infrastructure

documentary, mockumentary, docufiction
Web Series | 2021 PG | Season 1 | 17 Episodes Runtime: 11 x 0hr10m, 6 x 0hr11m

Global Partners – ott-vod-svod-aod Consulting, content licensing and distribution queries welcome.


© Wise Words Media and Callumny Films 2010 – 2021 all footage and stills

Watch | All Episodes | subscribe

Callumny Films – seller profile | content buyers



Season 1

production  | 30 Nov 2014 – 16 May 2021

filming | 16 May 2016 – 11 Jul 2016

post – production  | 11 Jul 2016 – 16 May 2021

trailersepisodes

1 – 5 | 6 – 10 | 11 – 15 | 16 – 17

Callumny Films TV | this public transport life – trains

STM Asia Pacific Construction | meet the team

Leave a Reply