episode list | subscribe
episode #1.16 | The Contract: PROJECT: Waterman [season 1]
Documentary, Drama, Miscellaneous 180 Minutes
PLOT OUTLINE: “It’s just so dangerous FRENCHIE. I just can’t stop thinking about it”. WATERMAN’s foreign film crew have found him alone outside at Blackburn’s former Westpac branch.
PLOT SUMMARY: His mind turning over repeatedly, WATERMAN is inconsolable. Alone.
Works go on unabated around Blackburn’s Level Crossing Removal Project. None of it registers with WATERMAN…Until his phone rings. The film crew witnesses WATERMAN’s heated exchange with one of his colleagues.
Then MASTON shows up to confront WATERMAN, demanding comments about a folio of glossy A4 photo’s alleging worksite corruption.
STM Asia Pacific Construction has a whistle-blower.
—
Forget the idea’s economy – it’s garbage. Australia’s future lies within the public transport infrastructure sector. Join WATERMAN’S ‘public relations tour’ around Melbourne’s exploding construction activity for exclusive behind-the-scenes access to some of the biggest train network infrastructure project’s this country has ever seen.
Web Series | 2021 PG | Season 1 | 17 Episodes Runtime: 11 x 0hr10m, 6 x 0hr11m
documentary, mockumentary, docufiction
Global Partners – ott-vod-svod-aod | Consulting, content licensing and distribution queries welcome.
Callumny Films – seller profile | content buyers
© Wise Words Media and Callumny Films 2010 – 2021 all footage and stills
TECH SPECS
Production Studios | Wise Words Media, Callumny Films
Type | TV Series
Countries of origin | Australia
Format | SD
Audio Languages | English
Dubbing Languages | Nil
Subtitles Languages | Nil
Consulting, content licensing and distribution queries welcome.
FILMING LOCATIONS | Melbourne, Australia
- Westpac Branch-vacancy, South Parade, Blackburn
- Level Crossing, Blackburn Rd, Blackburn
- Morton Park-Oval 1, Blackburn
- Morton Park-Nth East, Blackburn
- Morton Park (Nth East)/Glen Eibor Ave, Blackburn
- Morton Park (Nth East), Blackburn
- Morton Park, Glen Eibor Ave, Blackburn
- Caltex Petrol Station-vacancy, Blackburn
The Contract: PROJECT: Waterman [season 1]
Episode #1.16 | 9 Jul 2016 | Episode Runtime: 0hr 10m 48s
When the safety of local kids in WATERMAN’s community is put at risk by train & public transport sector works around a local football oval, the infrastructure consultant must choose between his job and his own moral code.
get the inside view from the industry outsider
Australia’s future – now more than ever – needs public transport infrastructure
documentary, mockumentary, docufiction
Web Series | 2021 PG | Season 1 | 17 Episodes Runtime: 11 x 0hr10m, 6 x 0hr11m
Global Partners – ott-vod-svod-aod | Consulting, content licensing and distribution queries welcome.
© Wise Words Media and Callumny Films 2010 – 2021 all footage and stills
Watch | All Episodes | subscribe
Callumny Films – seller profile | content buyers
- Film Producer | Bio
- The Contract | Project Waterman
- Callumny Films | about
- Global Partners | ott-vod-svod-aod
- The Contract: Project: Waterman | Cinando – profile