Episode #1.6 | 27 Jun 2016 | Episode Runtime: 0hr 10m 0s

episode list | subscribe

episode #1.6 | The Contract: PROJECT: Waterman [season 1]

PG Documentary, Drama, Miscellaneous 180 Minutes

PLOT OUTLINE:  A flooding underpass at Blackburn Train Station for years. People just want input into the works that going on within and around their community.  Let us have a voice. 

PLOT SUMMARY: With the formalities of the Investor Relations Tours now completed for both investors and media, WATERMAN sets his sights on Blackburn’s Level Crossing Removal Project.

Despite an early morning distraction from ‘Kerry Kiwi’ – a very lost, somewhat toothless, yet very jovial B-Double driver – WATERMAN walks a well-trodden path for viewers through the aged and dilapidated pedestrian underpass at Blackburn Train Station.  It is prone to frequent flooding, making it impassable to commuters.

While WATERMAN know’s the pedestrian underpass will be renovated and updated, the good residents of Blackburn are completely in the dark as to how this be made possible….and when.

Forget the idea’s economy – it’s garbage. Australia’s future lies within the public transport infrastructure sector. Join WATERMAN’S ‘public relations tour’ around Melbourne’s exploding construction activity for exclusive behind-the-scenes access to some of the biggest train network infrastructure project’s this country has ever seen.

Web Series | 2021 PG | Season 1 | 17 Episodes Runtime: 11 x 0hr10m, 6 x 0hr11m
documentary, mockumentary, docufiction

Global Partners – ott-vod-svod-aod Consulting, content licensing and distribution queries welcome.

Callumny Films – seller profile | content buyers

© Wise Words Media and Callumny Films 2010 – 2021 all footage and stills


TECH SPECS

Production Studios | Wise Words Media, Callumny Films

Type | TV Series

Countries of origin | Australia

Format | SD

Audio Languages | English

Dubbing Languages | Nil

Subtitles Languages | Nil

Consulting, content licensing and distribution queries welcome.

FILMING LOCATIONS | Melbourne, Australia

  • Blackburn Library, Blackburn Rd, Blackburn
  • Blackburn Tennis Club, Central Ave, Blackburn
  • Rear Laneway-Albert St/Railway Rd, Blackburn
  • Bus Interchange, Blackburn Train Station, South Parade, Blackburn
  • Roundabout-Railway Rd/Blackburn Rd, Blackburn
  • Bus Interchange, Blackburn Train Station, Platform 3
  • Bus Interchange, Blackburn Train Station, Railway Rd, Blackburn

The Contract: PROJECT: Waterman [season 1]

Episode #1.6 | 27 Jun 2016 | Episode Runtime: 0hr 10m 0s

When the safety of local kids in WATERMAN’s community is put at risk by train & public transport sector works around a local football oval, the infrastructure consultant must choose between his job and his own moral code.

get the inside view from the industry outsider
Australia’s future – now more than ever – needs public transport infrastructure

documentary, mockumentary, docufiction
Web Series | 2021 PG | Season 1 | 17 Episodes Runtime: 11 x 0hr10m, 6 x 0hr11m

Global Partners – ott-vod-svod-aod Consulting, content licensing and distribution queries welcome.


© Wise Words Media and Callumny Films 2010 – 2021 all footage and stills

Watch | All Episodes | subscribe

Callumny Films – seller profile | content buyers



Season 1

production  | 30 Nov 2014 – 16 May 2021

filming | 16 May 2016 – 11 Jul 2016

post – production  | 11 Jul 2016 – 16 May 2021

trailersepisodes

1 – 5 | 6 – 10 | 11 – 15 | 16 – 17

Callumny Films TV | this public transport life – trains

STM Asia Pacific Construction | meet the team

Leave a Reply